[S0892-7219(00)00201-6]
Issue Section:
Technical Papers
1.
Pemex-IMP, 1997, Criterio Transitorio para el Disen˜o
y Evaluacio´n de Plataformas Marinas Fijas en la Sonda de Campeche, Pemex
Exploracio´n y Produccio´n–Instituto Mexicano del Petro´leo, Primera edicio´n.
May.
2.
American Petroleum Institute, API, 1993, Recommended
Practice for Planning, Designing and Constructing Fixed Offshore Platforms.
Working Stress Design. API-Recommended Practice 2AA-WSD (RP-2AA-WSD) 20th
Edition, July.
3.
American Petroleum Institute, API, 1995, Proposed
Revision to RP-2A-WSD. Recommended Practice for Planning, Designing and
Constructing Fixed Offshore Platforms. Assessment of Existing Platforms, Draft
Section 17.
4.
Bea, R. G., 1997, “Risk Hurricanes and Earthquake
Criteria of Platforms in the Bay of Campeche,” Report to Petro´leos Mexicanos.
Nov.
5.
Bea, R. G., 1997, “Risk Based Oceanographic Criteria
for Platforms in the Bay of Campeche,” Symposium on Risk Based Criteria,
Pemex-IMP, Mexico City. Sept.
6.
Bea, R. G., Ramos, R., and Valle, O., 1998, “Risk
Assessment and Management Based Hurricane Wave Criteria for Design and
Requalification of Platforms in the Bay of Campeche,” Procedure OTC paper 8692.
May.
7.
International Standards Organization (ISO), 1996,
Draft B, WG3 Fixed Steel Structures.
8.
Oceanweather Incorporated, 1996, Final Report
Hurricane Roxanne/1996 Hindcast Study. May.
9.
Oceanweather Incorporated, 1996, Update of
Meteorological and Oceanographic Hindcast Data and Normal and Extremes Bay of
Campeche. Nov.
10.
Pemex-IMP, 1998, Criterio Transitorio para el Disen˜o
y Evaluacio´n de Plataformas Marinas Fijas en la Sonda de Campeche. Pemex
Exploracio´n y Produccio´n–Instituto Mexicano del Petro´leo. Segunda edicio´n.
Apr.
11.
Cha´vez, M., 1997, “Seismic Hazard at Sites of the
Bay of Campeche for the Risk Assessment of Pemex Offshore Facilities,” Report to
Pemex and IMP, Aug.
12.
Lotsberg, I., 1993, “Requalification of Offshore
Platforms,” Procedure Assessment and Requalification of Offshore Production
Structures, Internal Workshop.
13.
Pemex-IMP, 1981, Manuals Inspection and Maintenance
Offshore Platforms.
14.
Rey, L. E., Bayazitoglu, Y., and Va´ldes, M., 1998,
“Assessment of Offshore Platforms in the Bay of Campeche,” Application of the
new Assessment Criteria, Procedure OTC paper 8693, May.
15.
Report to Petro´leos Mexicanos, 1997, Risk Hurricanes
and Earthquake Criteria of Platforms in the Bay of Campeche.
Nov.
16.
Det Norske Veritas, 1997, Rules for the Design
Construction and Inspection of Offshore Structures.
17.
Salayda, J. M., 1997, Development of Oceanographic
Design Criteria for Platforms, Wave/Sea Bottom Interaction Effects. Report
Pemex-IMP.
18.
Petro´leos Mexicanos, Instituto Mexicano del
Petro´leo, 1994, Trial Application of API-RP-2AA-WSD. Draft, Section 17.
Assessment of Existing Platforms for Platform “Nohoch B,” Oct.
19.
Valde´s, V., Valle, O., and Bayazitoglu, Y., 1998,
“Hurricane Roxanne and a New Criteria for Bay of Campeche,” Procedure OTC paper
8691. May.
Copyright © 2000
by ASME
You do not currently have access to this content.