[S0892-7219(00)00201-6]

1.
Pemex-IMP, 1997, Criterio Transitorio para el Disen˜o y Evaluacio´n de Plataformas Marinas Fijas en la Sonda de Campeche, Pemex Exploracio´n y Produccio´n–Instituto Mexicano del Petro´leo, Primera edicio´n. May.
2.
American Petroleum Institute, API, 1993, Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms. Working Stress Design. API-Recommended Practice 2AA-WSD (RP-2AA-WSD) 20th Edition, July.
3.
American Petroleum Institute, API, 1995, Proposed Revision to RP-2A-WSD. Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms. Assessment of Existing Platforms, Draft Section 17.
4.
Bea, R. G., 1997, “Risk Hurricanes and Earthquake Criteria of Platforms in the Bay of Campeche,” Report to Petro´leos Mexicanos. Nov.
5.
Bea, R. G., 1997, “Risk Based Oceanographic Criteria for Platforms in the Bay of Campeche,” Symposium on Risk Based Criteria, Pemex-IMP, Mexico City. Sept.
6.
Bea, R. G., Ramos, R., and Valle, O., 1998, “Risk Assessment and Management Based Hurricane Wave Criteria for Design and Requalification of Platforms in the Bay of Campeche,” Procedure OTC paper 8692. May.
7.
International Standards Organization (ISO), 1996, Draft B, WG3 Fixed Steel Structures.
8.
Oceanweather Incorporated, 1996, Final Report Hurricane Roxanne/1996 Hindcast Study. May.
9.
Oceanweather Incorporated, 1996, Update of Meteorological and Oceanographic Hindcast Data and Normal and Extremes Bay of Campeche. Nov.
10.
Pemex-IMP, 1998, Criterio Transitorio para el Disen˜o y Evaluacio´n de Plataformas Marinas Fijas en la Sonda de Campeche. Pemex Exploracio´n y Produccio´n–Instituto Mexicano del Petro´leo. Segunda edicio´n. Apr.
11.
Cha´vez, M., 1997, “Seismic Hazard at Sites of the Bay of Campeche for the Risk Assessment of Pemex Offshore Facilities,” Report to Pemex and IMP, Aug.
12.
Lotsberg, I., 1993, “Requalification of Offshore Platforms,” Procedure Assessment and Requalification of Offshore Production Structures, Internal Workshop.
13.
Pemex-IMP, 1981, Manuals Inspection and Maintenance Offshore Platforms.
14.
Rey, L. E., Bayazitoglu, Y., and Va´ldes, M., 1998, “Assessment of Offshore Platforms in the Bay of Campeche,” Application of the new Assessment Criteria, Procedure OTC paper 8693, May.
15.
Report to Petro´leos Mexicanos, 1997, Risk Hurricanes and Earthquake Criteria of Platforms in the Bay of Campeche. Nov.
16.
Det Norske Veritas, 1997, Rules for the Design Construction and Inspection of Offshore Structures.
17.
Salayda, J. M., 1997, Development of Oceanographic Design Criteria for Platforms, Wave/Sea Bottom Interaction Effects. Report Pemex-IMP.
18.
Petro´leos Mexicanos, Instituto Mexicano del Petro´leo, 1994, Trial Application of API-RP-2AA-WSD. Draft, Section 17. Assessment of Existing Platforms for Platform “Nohoch B,” Oct.
19.
Valde´s, V., Valle, O., and Bayazitoglu, Y., 1998, “Hurricane Roxanne and a New Criteria for Bay of Campeche,” Procedure OTC paper 8691. May.
You do not currently have access to this content.