The trend towards most offshore field developments occurring in deep waters has increased the dependency on marine operations in the offshore industry. The installation of sub sea templates as well as offshore floating units year round is profitable from a net present value point of view, but the risks involved to the owners are increasing when working off-season in bad weather. This calls for analysis of the risk and identification of efficient risk-reducing measures. In this paper, the effect of setting proper weather criteria for marine operations and reducing the uncertainty in the weather forecast is highlighted. During the latest years, severe losses have been reported as caused by failures during marine operations. The need for risk analysis of marine operations is therefore underlined. This calls for an overview of the tools available to analyze risks during marine operations. In this paper, some different assessment tools are reviewed, and recommendations are given as to the appropriateness of using these tools. Both qualitative and quantitative tools are discussed with a general recommendation of employing the more sophisticated tools when the consequences are large. Qualitative analysis should normally be carried out before any quantitative analysis.

1.
Gudmestad, O. T., Rettedal, W. K., Aarum, T., and Vegge, A., 1994, “Use of Risk Analysis in Offshore Construction Projects,” Proc. OMAE 94, Houston, I, pp. 417–432.
2.
Anon., 1999, “Jacket System Suffers at Sea,” Offshore Engineer, Nov., pp. 13–14.
3.
Anon., 1999, “Lives Lost as Loaded Heavy Lift Ship Capsizes,” Offshore Engineer, Nov., p. 5.
4.
Gudmestad, O. T., and Bjerke, P. E., 1999, “Uncertainties in Weather Forecasting, a Risk to Offshore Operations,” Proc. of ISOPE Conf., Brest, II, pp. 375–380.
5.
Anon., 1999, “Module Plunges Puts Brakes on Petronas,” Offshore Engineer, Jan., p. 5.
6.
Annon., 1999, “Gulf of Mexico,” Pet. Eng. Int., pp. 43 and 46.
7.
Anon., 1999, “Texaco Evaluating Options for Petronas Continuation,” Offshore, Jan., p. 58.
8.
Gudmestad, O. T., Gordon, R., Bellamy, L. J., and Rettedal, W. K., 1997, “The Role of Human and Organizational Factors (HOF) in the Fabrication, Installation and Modification (FIM) Phases of Offshore Facilities,” Proc. of 7th Int. Conf. on Structural Safety and Reliability, ICOSSAR, Kyoto, 3, pp. 2057–2068.
9.
Stølsnes, R. R., Gudmestad, O. T., and Bea, R. G., 2001, “On the Importance of Human and Organizational Factors in Design, Construction and Installation of Engineered Systems,” Proc. of ISOPE 2001, Stavanger, IV, pp. 465–474.
10.
Jacobsen, B., 1992, “The loss of Sleipner A Platform,” Proc. of ISOPE, San Francisco, CA, pp. 1–8.
11.
Rettedal, W. K., Gudmestad, O. T., and Aarum, T., 1993, “Design of Concrete Platforms after Sleipner A Sinking,” Proc. of OMAE 93, Glasgow, pp. 309–319.
12.
Norwegian Petroleum Directorate: “Acts, Regulations and Provisions for the Petroleum Activity,” 2, NPD, Stavanger, latest issue and Norwegian Petroleum Directorate, “Regulations concerning Load bearing Structures in the Petroleum Activities,” Issued by NPD, Stavanger, Norway on 7 Feb 1992, latest issue to apply.
13.
Pate-Cornell
,
E. M.
,
1990
, “
Organizational Aspects of Engineering System Safety: The Case of Offshore Platforms
,”
Science
,
250
, pp.
210
217
.
14.
Trbojevic
,
V. M.
,
Bellamy
,
L. J.
,
Brabazon
,
P. G.
,
Gudmestad
,
O. T.
, and
Rettedal
,
W. K.
, (
1994
) “
Methodology for the Analysis of Risks During Construction and Installation Phases of an Offshore Platform
,”
J. Loss Prevention Process Indust.
,
7
(
4
), pp.
350
359
.
15.
Lakats, L., Gudmestad, O. T., Skjæveland, H., Rettedal, W. K., and Gausel, E., 1998, “Managing Offshore Platform Construction Taking into Account ‘Bad News;’ A Case Study,” Paper WA06.4 Presented at Institute for Operations Research and the Management Sciences, National Meeting, Montreal, Quebec.
16.
Rettedal, W. K., and Gudmestad, O. T., 1995, “Acceptance Criteria for Risk in Offshore Construction Projects,” Proc. of OMAE 95, Copenhagen, I B, pp. 67–75.
17.
Guedes Soares, C. (ed.), 1998, Risk and Reliability in Marine Technology, Balkema.
18.
Gudmestad, O. T., Rettedal, W. K., Sand, S., Brabazon, P. G., Trbojevic, V., and Helsøe, E., 1995, “Use of Simulator Training to Reduce Risk in Offshore Marine Operations,” Proc. of OMAE 95, Copenhagen, II, pp. 513–521.
19.
Gudmestad
,
O. T.
, and
Løset
,
S.
,
1998
, “
Risk Assessment Procedures Related to Designs of Ships and Offshore Structures in Ice
,”
Journal of Navigation and Hydrography (Russian Journal)
,
6
, pp.
18
21
(English) and pp. 22–26 (Russian).
20.
Hopkins, J. S., 1994, “The Assessment of Forecast Accuracy: Some Risk Considerations for an Offshore Operation,” Marine Advisory & Consultancy Service. UK Met. Office. Report prepared for Four Elements, London.
21.
Nilsen
,
T. N.
,
Gudmestad
,
O. T.
,
Dalane
,
J. I.
,
Rettedal
,
W. K.
, and
Aven
,
T.
,
1998
, “
Utilisation of Principles from Structural Reliability in Quantitative Risk Analysis. Example from an Offshore Transport Problem
,”
Reliability Eng. Sys. Safety
,
61
, pp.
127
137
.
22.
Brabazon, P. G., Hopkins, J. S., and Gudmestad, O. T., 1996, “Estimating the Likelihood of Weather Criteria Exceedance During Marine Operations,” Proc. of OMAE 96, II, pp. 23–28.
23.
Hopkins, J. S., 1997, “The Accuracy of Wind and Wave Forecast,” Marine Advisory & Consultancy Service, UK Met. Office. Report OTH483, Issued by UK Health and Safety Executive, London.
24.
Hjøllo, B. A˙., and Myklebust, R., 1997, “Validering av Bølgevarsler for Ekofisk, Prognosedøgn 0 til 7,” DMNI Report VpV01/1997, Bergen (in Norwegian).
25.
Teixeira, J. C., Abreu, M. P., and Guedes Soares, C., “Variability of Ocean Wave Hindcasts due to Wind Models,” Proc. of 12th Int. Conf. on Offshore Mechanics and Arctic Engineering, C. Guedes Soares, et al. (ed.), OMAE, II, pp. 125–133.
26.
Holthuijsen
,
L. H.
,
Booij
,
N.
, and
Bertotti
,
L.
,
1996
, “
The Propagation of Wind Errors Through Ocean Wave Hind Casts
,”
ASME J. Offshore Mech. Arct. Eng.
,
118
(
3
), pp.
184
189
.
27.
Sebastia˜o
,
P.
,
Soares
,
C. Guedes
, and
Booij
,
N.
,
2000
, “
Wave Hind Casting off the Coast of Portugal
,”
Coastal Eng.
,
40
, pp.
411
425
.
28.
Rettedal, W. K., 1999, “Quantitative Risk Acceptance Criteria in View of Two Bayesian Models,” pp. 1309–1314, ESREL 99, Schuller and Kafka (eds.), Balkema, Rotterdam.
29.
Health and Safety at Work Act, 1974, London, HMSO.
30.
Trbojevic, V. M., Bellamy, L. J., Gudmestad, O. T., Aarum, T., and Rettedal, W. K., 1996, “Assessment of Risk in the Design Phase of an Offshore Project,” Proc. of OMAE-96, Florence, II, pp. 431–435. (Also presented at Risk Assessment of Offshore Installations, Conf. organized by ERA Technology, London, November 1997.)
31.
Holand, I., Gudmestad, O. T., and Jersin, E., 2000, Offshore Concrete Structures Design Guide, E&FN Spon, London.
32.
Aven
,
T.
, and
Poern
,
K.
,
1998
, “
How Should We Express and Interpret the Results of Quantitative Risk Analysis
,”
Reliability Eng. Sys. Safety
,
61
, pp.
3
10
.
33.
Swain, A. D., and Gutterman, H. E., 1983, A Handbook on Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, NUREG/CR-1298, Nuclear Regulatory Commission, Washington, DC.
34.
Bellamy, L. J., Kirwan, B., and Cox, R. A., 1986, “Incorporating Human Reliability Into Probabilistic Risk Assessment,” Proc. of 5th Int. Symp. on Loss Prevention and Safety Promotion in the Process Industries, Societe´ de Chimie Industrielle, Paris, I, pp. 6-1–6-20.
35.
Safety and Reliability Directorate, 1988, “Human Reliability Assessors Guide,” SRD Report RTS 88/5Q, P. Humphreys (ed.), UK Atomic Energy Authority, Culcheth.
36.
Hunns, D. M., and Daniels, B. K., 1980, The method of paired comparison, Proc. of 6th Symp. on Advances in Reliability Technology, Report NCSR R23, UK Atomic Energy Authority, Culcheth, pp. 31–71.
37.
Kristiansen, S., Koster, E., Schmidt, W. F., Olofsson, M., Guedes Soares, C., and Caridis, P., 1999, “A New Methodology for Marine Casualty Analysis Accounting for Human and Organisational Factors,” Proc. of Int. Conf. on Learning from Marine Incidents, London, paper 14, pp. 1–14.
38.
Guedes Soares, C., Teixeira, A. P., and Anta˜o, P., 2000, “Accounting for Human Factors in the Analysis of Maritime accidents,” Foresight and Precaution, M. Cottam, D. Harvey, R. Pape, and J. Tait (eds.), Balkema, Rotterdam, pp. 521–528.
39.
OREDA, 1992, Offshore Reliability Data, 2nd edition, OREDA participants.
40.
Zolotukhin, A. B., and Gudmestad, O. T., 2000, “Use of Fuzzy Set Theory in Qualitative and Quantitative Risk Assessment,” Proc. (on CD-ROM) of SPE 5. Int. Conf. on Health, Safety and Environment, Stavanger.
41.
Aven
,
T.
, and
Rettedal
,
W. K.
,
1998
, “
Bayesian Frameworks for Integrating QRA and SRA Methods
,”
Struct. Safety
,
20
, pp.
155
165
.
42.
Rettedal
,
W. K.
,
Aven
,
T.
, and
Gudmestad
,
O. T.
,
2000
, “
Integrating QRA and SRA Within a Bayesian Framework When Calculating Risk in Marine Operations. Two Examples
,”
ASME J. Offshore Mech. Arct. Eng.
,
122
(
3
), pp.
181
187
.
43.
Guedes Soares, C., Vinnem, J. E., and Faber, M., 1995, “On the Integration of Quantified Risk Assessment and Structural Reliability in the Offshore Industry,” Proc. of European Safety and Reliability Conf. (ESREL ’95), I. A. Watson and M. P. Cottam (eds.), Chameleon Press Ltd, London, I, pp. 49–68.
44.
Trbojevic, V. M., and Guedes Soares, C., 2000, “Risk Based Methodology for a Vessel Safety Management System,” Foresight and Precaution, M. Cottam, D. Harvey, R. Pape, and J. Tait (eds.), Rotterdam, Balkema, pp. 483–496.
45.
Hollobone, H., 1979, “Risk Analysis of Diving Operations from Dynamically Positioned Vessels,” Dept. of Energy Offshore Technology Report, OT-R-7958.
You do not currently have access to this content.