On the large scale of deep-water construction, marine pipelines are extremely flexible. Construction procedures can exploit that flexibility to connect pipelines and risers to floaters, manifolds, wellheads, buoys, and platforms. The paper describes a three-dimensional physical model technique. It helps the engineer to think imaginatively and rapidly to explore different options, with the objective of minimizing construction risk and creating procedures that can be accomplished by the equipment available. The relevant governing equations are derived, and from them come the conditions required for the model to obey the correct mechanical similarity conditions. The model is exact, and can be used to derive forces and stresses; it is much more than just a picture. The paper describes a series of applications to two- and three-dimensional pipeline construction problems, most recently an application to the current Thunder Horse project.

1.
Palmer
,
A. C.
,
Hutchinson
,
G.
, and
Ells
,
J. E.
, 1974, “
Configuration of Submarine Pipelines During Laying Operations
,”
ASME J. Eng. Ind.
0022-0817,
96
, pp.
1112
1118
.
2.
Palmer
,
A. C.
, 1975. “
Technical and Analytical Aspects of Pipelaying in Deep Water
,”
Proc., Inst. Marine Engineers/Soc. for Underwater Technology Joint Conference on Pipelining in the North Sea
,
London, pp.
6
11
.
3.
Palmer
,
A. C.
,
Brown
,
R. J.
,
Kenny
,
J. P.
, and
Kaustinen
,
O. M.
, 1977, “
Construction of Pipelines Between the Canadian Arctic Islands
,”
Proc. 4th Int. Conf. on Port and Ocean Engineering under Arctic Conditions
,
St. John’s
, Nfld.,
1
, pp.
395
404
.
4.
Kaustinen
,
O. M.
,
Brown
,
R. J.
, and
Palmer
,
A. C.
, 1983, “
Submarine Pipeline Crossing of M’Clure Strait
,”
Proc. 7th Int. Conf. on Port and Ocean Engineering under Arctic Conditions
,
Espoo
,
1
, pp.
289
299
.
5.
Palmer
,
A. C.
,
Baudais
,
D. J.
, and
Masterson
,
D. M.
, 1979. “
Design and installation of a submarine flowline in the Canadian Arctic Islands
,”
Proc. 11th Ann. Offshore Technology Conf.
,
Houston,
2
, pp.
765
772
.
6.
Brown
,
R. J.
, “
Engineering Innovation for Subsea Pipeline Connections
,” 1977, Pipeline Industry.
7.
Brown
,
R. J.
, 1989, “
Completion of Placid Deep-water Green Canyon Pipelines
,”
Proc., Deep Offshore Technology (DOT) Conf.
,
Marbella, Spain.
8.
Brown
,
R. J.
, 1994, “
History and Latest Developments in Pipeline Installations and Bundle Technology
,”
Proc., Offshore Pipeline Technology Conf.
,
Oslo.
You do not currently have access to this content.