Achieving uniform bolt preload is difficult when tightening a pipe flange with a number of bolts. Several bolt-tightening strategies have been proposed so far for achieving uniform bolt preloads. It seems, however, that effective guidelines for tightening pipe flange connections have not been established. In this study, a numerical approach is presented for estimating the scatter in bolt preloads and achieving the uniform bolt preloads when tightening each bolt one by one in an arbitrary order. Numerical analyses are conducted using three-dimensional FEM as an elastic contact problem. The analytical objects are pipe flanges specified in JIS B 2238 with an aluminum gasket inserted. The validity of the numerical procedures proposed here is ascertained by experiment.

1.
Bibel
,
G. D.
, and
Ezell
,
R. M.
,
1992
, “
An Improved Flange Bolt-Up Procedure Using Experimentally Determined Elastic Interaction Coefficients
,”
ASME J. Pressure Vessel Technol.
,
114
, pp.
439
443
.
2.
Weber, E. M., and Bibel, G. D., 1994, “Flange Bolt-Up Simulation Using 3-D Finite Element Modeling,” ASME PVP-Vol. 274, pp. 63–82.
3.
Goddard, D. L., and Bibel, G. D., 1994, “Bolt Preload Variation During Torquing of a Bolted Flange Connection,” ASME PVP-Vol. 274, pp. 25–32.
4.
Hwang
,
D. Y.
, and
Stallings
,
J. M.
,
1994
, “
Finite Element Analysis of Bolted Flange Connections
,”
Comput. Struct.
,
51
, No.
5
, pp.
521
533
.
5.
Rao
,
D. G.
,
Ramamurti
,
V.
, and
Narayanan
,
S.
,
1985
, “
Effect of Bolt Load on the Deformation of a Taper Hub Flange
,”
Comput. Struct.
,
21
, No.
3
, pp.
405
412
.
6.
Sawa
,
T.
,
Hogurashi
,
N.
, and
Akagawa
,
H.
,
1991
, “
A Stress Analysis of Pipe Flange Connection
,”
ASME J. Pressure Vessel Technol.
,
113
, pp.
497
503
.
7.
Bouzid
,
A.
, and
Chaaban
,
A.
,
1997
, “
An Accurate Method of Evaluating Relaxation in Bolted Flanged Connection
,”
ASME J. Pressure Vessel Technol.
,
119
, pp.
10
17
.
8.
Bouzid, A., and Derenne, M., 1999, “A Simple Method for Analyzing the Contact Stress in Bolted Flange Joints With Non-Linear Gaskets,” ASME PVP-Vol. 382, pp. 103–111.
9.
Cao, B., Duan, C., and Xu, H., 1999, “3-D Finite Element Analysis of Bolted Flange Joint Considering Gasket,” ASME PVP-Vol. 382, pp. 121–126.
10.
Fukuoka
,
T.
,
1997
, “
Evaluation of the Method for Lowering Stress Concentration at the Thread Root of Bolted Joints with Modifications of Nut Shape
,”
ASME J. Pressure Vessel Technol.
,
119
, pp.
1
9
.
11.
Fukuoka, T., and Takaki, T., 1998, “Three-Dimensional Finite Element Analysis of Pipe Flange—Effects of Flange Interface Geometry,” ASME PVP-Vol. 367, pp. 125–131.
You do not currently have access to this content.