In this paper, interruption risk in construction activities of bridge projects is assessed in order to identify the main causes of its occurrence and also to determine the potential outcomes resulted from the risk occurrence. To do this, fault tree and event tree analysis (ETA) methods are applied. As the application of the traditional approach of these two methods is difficult in many cases due to limited access to information, fuzzy arithmetic can be considered as a useful tool. In this research, first, fault tree structure is created according to consequences resulted from the Delphi method. Then, the probability of risk occurrence is calculated by applying fault tree analysis (FTA) based on fuzzy logic. By establishing the structure of fault tree related to the failure risk of mitigation strategies, the main causes relating to failure of strategies are identified. The structure of the event tree is created using the obtained results; moreover, the expected monetary value (EMV) of risk event is computed. Finally, to validate the results obtained, a model is created by Monte Carlo simulation and then the results obtained by applying the two methods are compared. The EMV of the risk event evaluated in this paper is determined to be 9.93% of the project baseline cost.

References

1.
Project Management Institute (PMI)
,
2004
,
A Guide to the Project Management Body of Knowledge
, 3rd ed.,
PMI Publications
,
Wexford, PA
.
2.
Gereie
,
A.
,
Taiiebat
,
M.
,
Shakhs-Niaei
,
M.
, and
Rezaei
,
K.
,
2007
, “
Providing a Model to Consider the Dependency of Uncertainties in Monte Carlo Simulation to Improve the Quantitative Analysis Process of Project Risk
,”
3rd International Conference of Project Management
,
Aryana Industrial & Research Group
,
Tehran, Iran
(in Persian).
3.
NASA
,
2002
, “Fault tree hand book with aerospace applications,”
Office of Safety and Mission Assurance
,
NASA Headquarters
,
Washington, DC
.
4.
Todinov
,
T. M.
,
2006
,
Risk-Based Reliability Analysis and Generic Principles for Risk Reduction
,
Elsevier Science & Technology Books
,
Amsterdam
.
5.
Zadeh
,
L. A.
,
1965
, “
Fuzzy Sets
,”
Inform. Control
,
8
(
3
), pp. 
338
353
.
6.
Ericson
,
C.
,
2005
,
Hazard Analysis Techniques for System Safety
,
John Wiley and Sons
,
New York
.
7.
Limnios
,
N.
,
2007
,
Fault Trees
(Control Systems, Robotics and Manufacturing Series),
ISTE Ltd
,
London
.
8.
Abdelgawad
,
M. A.
,
2011
, “
Hybrid Decision Support System for Risk Criticality Assessment and Risk Analysis
,” Ph.D. thesis,
University of Alberta
, Edmonton, Alberta.
9.
Esfahani
,
H.
,
2010
,
Risk Assessment by Fault Tree Analyzing Method
, 1st ed.,
Superior College Publisher
,
Tehran
(in Persian).
10.
Abdelgawad
,
M. A.
, and
Fayek
,
A. R.
,
2011
, “
Fuzzy Reliability Analyzer: A Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault Tree Analysis
,”
J. Const. Eng. Manage.
,
137
(
4
), pp. 
294
302
.10.1061/(ASCE)CO.1943-7862.0000285
11.
Rezvani
,
M. A.
, and
Jafarian
,
E.
,
2011
, “
Assessment the Main Causes of Undesired Event of Train Departure From Station and Its Entering to Occupied Line Part by Using Fuzzy Approach of Fault Tree Analysis Technique
,”
6th National Congress of Civil Engineering
,
Semnan University
,
Iran
(in Persian).
12.
Srivastava
,
A.
,
2008
, “
Generalized Event Tree Algorithm and Software for Dam Safety Risk Analysis
,” Thesis presented to Utah State University in partial fulfillment of the requirements for master degree.
13.
Guimarẽes
,
A. C. F.
, and
Ebecken
,
N. F. F.
,
1999
, “
Fuzzy FTA: A Fuzzy Fault Tree System for Uncertainty Analysis
,”
Ann. Nucl. Energy
,
26
(
6
), pp. 
523
532
.10.1016/S0306-4549(98)00070-X
14.
Huang
,
H.
,
Yuan
,
X.
, and
Yao
,
X.
,
2000
, “
Fuzzy Fault Tree Analysis of Railway Traffic Safety
,”
Proceedings of the Conference on Traffic and Transportation Studies
,
ASCE
,
Reston, VA
, pp. 
107
112
.
15.
Yuhua
,
D.
, and
Datao
,
Y.
,
2005
, “
Estimating of Failure Probability of Oil and Gas Transmission Pipelines by Fuzzy Fault Tree Analysis
,”
J. Loss Prev. Process Ind.
,
18
(
2
), pp. 
83
88
.10.1016/j.jlp.2004.12.003
16.
Celik
,
M.
,
Lavasani
,
S. M.
, and
Wang
,
J.
,
2010
, “
A Risk-Based Modeling Approach to Enhance Shipping Accident Investigation
,”
Saf. Sci.
,
48
(
1
), pp.
18
27
.10.1016/j.ssci.2009.04.007
17.
Renjith
,
V. R.
,
Madhu
,
G.
,
Nayagam
,
V. L.
,
Bhasi
,
A. B.
,
2010
, “
Two-Dimensional Fuzzy Fault Tree Analysis for Chlorine Release From a Chlor-Alkali Industry Using Expert Elicitation
,”
J. Hazard. Mater.
,
183
(
1–3
), pp. 
103
110
.10.1016/j.jhazmat.2010.06.116
18.
Wang
,
W.
,
Jianga
,
X.
,
Xiaa
,
S.
, and
Caob
,
Q.
,
2010
, “
Incident Tree Model and Incident Tree Analysis Method for Quantified Risk Assessment: An In-Depth Accident Study in Traffic Operation
,”
Saf. Sci.
,
48
(
10
), pp. 
1248
1262
.10.1016/j.ssci.2010.04.002
19.
Project Management Institute
,
2008
,
A Guide to the Project Management Body of Knowledge
(translated by M. Zokaei Ashtiani), 4th ed.,
Adineh Publications
,
Tehran
(in Persian).
20.
Kia
,
M.
,
2010
,
Fuzzy Logic in MATLAB
, 1st ed.,
Kiyan Rayane Sabz Publications
,
Tehran
(in Persian).
21.
Kenarangui
,
R.
,
1991
, “
Event-Tree Analysis by Fuzzy Probability
,”
IEEE Trans. Reliab.
,
40
(
1
), pp. 
120
124
.10.1109/24.75348
22.
Huang
,
D
,
Chen
,
T.
, and
Wang
,
M.
,
2001
, “
A Fuzzy Set Approach for Event Tree Analysis
,”
Fuzzy Sets Syst.
,
118
(
1
), pp.
153
165
.10.1016/S0165-0114(98)00288-7
23.
Abdelgawad
,
M.
, and
Fayek
,
A. R.
,
2012
, “
A Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined FMEA, Fault Trees, Event Trees, and Fuzzy Logic
,”
J. Const. Eng. Manage.
,
138
(
5
), pp. 
642
651
.10.1061/(ASCE)CO.1943-7862.0000471
24.
Rozbehi
,
S.
, and
Joda
,
Kh.
,
2008
, “
Managing the Risk of Project by Pertmaster
,” 1st ed.,
Kiyan Rayane Sabz Publications
,
Tehran
(in Persian).
25.
Molkahi
,
R.
,
2010
,
Managing the Risk of Project
(translated by H. Avazkhah and A. H. Mohebi), 1st ed.,
Kiyan Rayane Sabz Publications
,
Tehran
(in Persian).
26.
Eshtehardian
,
E.
,
Nasre Azadani
,
S. M.
,
Safavi
,
A. R.
and
Alijani
,
A.
,
2010
, “
Evaluating the Delay Reasons of Time When Urban Constructive Projects are Performed According to Project Factors
,”
6th International Conference of Project Managing
,
Aryana Industrial & Research Group
,
Tehran, Iran
(in Persian).
You do not currently have access to this content.