In this Issue
Special Papers
A FMEA Optimization Method Based on TODIM and Best Worst Method-Water Filling Theory in Pythagorean Fuzzy Language Environment for Reliability Assessment of Industrial Robot
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021101.
doi: https://doi.org/10.1115/1.4066620
Topics:
Failure mechanisms
,
Failure mode and effects analysis
,
Risk
,
Robots
,
Water
,
Weight (Mass)
,
Reliability
,
Optimization
Optimizing Battery Maintenance and Reliability in Ground Control Station for Tethered High-Altitude Platforms
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021102.
doi: https://doi.org/10.1115/1.4067545
Topics:
Maintenance
,
Reliability
,
Sensitivity analysis
,
Failure
,
Batteries
,
Optimization
Survival Signature-Based Structural Importance Analysis of Multistate System With Binary-State Components
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021103.
doi: https://doi.org/10.1115/1.4067826
Topics:
Event history analysis
,
Failure
,
Reliability
,
Automotive brakes
Heuristic-Based Recommendation System for Dealing With Abnormal Situations in Industrial Applications
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021104.
doi: https://doi.org/10.1115/1.4067827
Topics:
Bayesian network
,
Data mining
,
Decision making
,
Failure
,
Machinery
,
Modeling
,
Ontologies
,
Probability
,
Semantics
,
Trains
Research Papers
Statistical Approaches for the Reduction of Measurement Errors in Metrology
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021201.
doi: https://doi.org/10.1115/1.4064284
Topics:
Density
,
Errors
,
Probability
Stochastic Modeling of Crack Growth and Maintenance Optimization for Metallic Components Subjected to Fatigue-Induced Failure
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021202.
doi: https://doi.org/10.1115/1.4066080
Topics:
Failure
,
Fatigue
,
Fracture (Materials)
,
Inspection
,
Maintenance
,
Modeling
,
Optimization
,
Probability
,
Uncertainty
,
Polynomials
Random Dynamic Responses of Two Parallel Interfacial Cracks Between a Functionally Graded Material Strip and Two Dissimilar Elastic Strips
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021203.
doi: https://doi.org/10.1115/1.4065930
Data-Informed Risk Analysis of Power Grids: Application of Method for Managing Heterogeneous Datasets
ASME J. Risk Uncertainty Part B. June 2025, 11(2): 021204.
doi: https://doi.org/10.1115/1.4066257
Topics:
Power grids
,
Risk analysis
,
Transmission lines
Select Articles from Part A: Civil Engineering
Email alerts
RSS Feeds
Propagation of Systematic Sensor Uncertainty Into the Frequency Domain
ASME J. Risk Uncertainty Part B (December 2025)
Reviewer's Recognition
ASME J. Risk Uncertainty Part B (September 2025)
Reviewer's Recognition
ASME J. Risk Uncertainty Part B (September 2025)
Balancing Interpretability and Uncertainty in Prognostic Models: A TOPSIS-Based Comparative Analysis of N-CMAPSS DS02 Methods
ASME J. Risk Uncertainty Part B
Mixed uncertainty analysis in pressure systems inspection applications
ASME J. Risk Uncertainty Part B